What determines the cost of renewing a stand

The price of the seat is a part of the project. To compare proposals, separate supply, fixings, removal, preparation, transport and assembly.

FanBase practical guide · Updated in October 2026

Renovación de 1.800 asientos SPARK CR en el pabellón y el campo de fútbol de Calp
01

Define the quantities and the product

Count the places by area and model. Add the color, customization options, and planned replenishments as identifiable items. Do not confuse an initial estimate of places with an approved technical distribution.

02

Separate work and equipment

Difference housing, support and disassembly anchors, support repair and installation. Indicates which computer executes each job. Access conditions and auxiliary means can also modify the scope.

03

Includes logistics and calendar

Destination, download, storage, and phasing must be included in the query. Request that deadlines, taxes and exclusions be expressly stated in the offer.

04

Compare the same scope

It uses a common table of items, units, quantities, inclusions and exclusions. The recovery of removed material must have its own scope. We do not publish a universal price per place because it would hide these differences.

Use it in your project

Prepare your request.

Tick what you already have. You can download the list to share with your team.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.