FanBase practical guide · Updated in October 2026
It distinguishes replacement of seats, repair of the support, redistribution of seats and renewal of the image. Separate confirmed jobs from those requiring inspection. This way the budget will respond to the same scope for all suppliers.
It brings together overviews, row profiles and visible details of seats and fixtures. Write down squares, tread, riser and available width. Identify the origin and date of the plans. Do not disassemble items to obtain photographs.
The coincidence of holes does not prove that an anchor is reusable. The technical team must review support, geometry, fixings, steps and distribution before closing the solution. Relate each model to its configuration and documentation.
Cross the sports calendar with disassembly, preparation, assembly and reception. If material recovery is being studied, define classification, storage and destination before removing the entries. Each phase needs clear scope and buy-in.
Use it in your project
Tick what you already have. You can download the list to share with your team.