Guides and resources
Practical guides.
Steps and criteria to choose, renovate and prepare a venue.
9 guides
Guide
Start with the state of the support, the measurements and the use of the enclosure. With this data you can study models, fixings and work phases.
Guide
The main difference is in the backrest: backless SR, closed CR and open and ventilated CRO. The choice is completed with use, distribution and fixation.
Guide
The price of the seat is a part of the project. To compare proposals, separate supply, fixings, removal, preparation, transport and assembly.
Guide
The fixation is chosen with the model, geometry and condition of the support. A photograph guides the study, but does not replace the validation of the whole.
Guide
Sun, water, environment and cleanliness determine the specification. You have to check the casing and also supports, anchors and accessories.
Guide
A useful routine combines compatible cleaning, inspection for damage, and recording replacements. The model instructions are the reference.
Guide
Recovery is studied before disassembly. You must know the material, quantities, condition, separation of components and viable destination.
Guide
A well-documented consultation helps to understand the space and prepare the following checks.
Guide
Color helps express the identity of a facility. The sample allows you to evaluate the proposal before finalizing it.