Stadiums and soccer fields
From general capacity to preference areas. Study locations, distribution and fixation.
Spaces, experiences and performances
Explore the compound, the area you want to equip or the transformation you are preparing. Then we specify the products and conditions of the project.
Space is the first starting point.
From general capacity to preference areas. Study locations, distribution and fixation.
Players, companions and new public areas next to the court.
Bleaches, first row and different uses of the track.
Audience, equipment and meeting spaces in the same facility.
Sports and coexistence areas in schools, campuses and community centers.
Tournaments, concerts and events with varying audience needs.
Configuration and availability subject to study.
Study spectator areas, permanence and exhibition of the complex.
Technical scope to be defined for each installation.
Resistance, maintenance, identity and configuration of locations.
Current products and expansion options
Study a higher level of comfort and a differentiated distribution.
In development
Partners, sponsors and corporate reception with their own experience.
In development
Study standing/sitting usage and complete system requirements.
Scope to be defined
Seats, work surfaces and provision of connections.
In development
Rest, protection and organization next to the playing field.
Current products and expansion options
Access, location and visuals as part of all areas of the venue.
Scope to be defined
Meeting, rest and coexistence before and after the event.
In development
Replace in phases based on the state of the installation.
Current products and expansion options
Study new locations and their integration with the existing space.
Current products and expansion options
Transform an area for members, sponsors or guests.
In development
Change the distribution according to the venue’s use program.
In development
Identify models, parts and priorities to preserve the installation.
Current products and expansion options
Identify and evaluate the removed material before defining its treatment.
Scope to be defined
Singular projects
A particular distribution, a club identity or a different use. Share the starting point to study which options are viable.
Each proposal requires reviewing technical feasibility, scope and conditions.